Commercial construction projects

Full Engineering has designed for the construction of its region projects of business buildings and buildings for large department stores. These projects involved foundations, concrete and metallic structures, water, sewage and electrical.

, , , ,

Project of reforms of industrial buildings

Full Engineering has prepared for a large mining company, civil projects and industrial architecture for reforms involving locker rooms, offices, control rooms, portarias and administrative areas. These projects involved, in addition to civil engineering, all of the building infrastructure such as sanitary, electrical, network, security and SPCI.

, , ,

Basic and detailed design of belt conveyors

Full Engineering developed in 2017 the basic and detailed design of more than 70 belt conveyors for a multinational supplier of industrial equipment. These equipments will attend a new fertilizer plant in Minas Gerais. Project that brought a huge challenge to the Full Engineering team because the basic design of all the transporters was accomplished in only 45 days and the project detailed in 75 days. This has proven the tuning of our team always working to meet the deadlines of our customers.

, , , , , ,

Air Conditioning System for Electric Rooms

A project of great importance was developed for a Brazilian cement industry. The project consisted of all the architecture and study of the environment for the electric rooms of the industry.

Important for the good operation of the plant, in the electric rooms are all the equipment that controls the automation, the operative machines and all the operation of the industry. So the air system is crucial to maintaining a controlled environment, free of heat and humidity for better performance of these equipments.

With the challenge in hand, Full sought the best professional in the market to develop a partnership, and hired a great engineer with extensive experience in electrical for industry.

Our partner did all the sizing and we did all the infrastructure, piping, lighting architecture, preparation for installation of equipment, positioning of appliances, exhaust fans, blowers. All the study of the environment.

It was a very fast project that lasted approximately 20 days, more than left marked in the history of Full by the complexity and success of the solutions developed.