Basic and detailed design of belt conveyors

Full Engineering developed in 2017 the basic and detailed design of more than 70 belt conveyors for a multinational supplier of industrial equipment. These equipments will attend a new fertilizer plant in Minas Gerais. Project that brought a huge challenge to the Full Engineering team because the basic design of all the transporters was accomplished in only 45 days and the project detailed in 75 days. This has proven the tuning of our team always working to meet the deadlines of our customers.

, , , ,

Bases and Foundations Project for Belt Conveyors

Full Engineering carried out in 2016 the project of bases and foundations for 29 conveyors of belts and 20 transfer houses for the expansion of a cement factory in Minas Gerais.

 

This project was carried out by subcontracting a construction company that carried out the work. Full Engineering takes great pride in this project which has brought to its client a very large quantitative reduction compared to the budgeted quantity. In total, 216 bases and foundations were calculated and detailed:

 

  • Reduction of 21% of the concrete volume planned;
  • Reduction in 31% of the area as planned;
  • 82% reduction in estimated cutting length