Full Engineering developed in 2017 the basic and detailed design of more than 70 belt conveyors for a multinational supplier of industrial equipment. These equipments will attend a new fertilizer plant in Minas Gerais. Project that brought a huge challenge to the Full Engineering team because the basic design of all the transporters was accomplished in only 45 days and the project detailed in 75 days. This has proven the tuning of our team always working to meet the deadlines of our customers.